Case Study

Batson-Cook Combats The Heat And Embraces Portability With The TOUGHBOOK 33

Source: Panasonic Corporation of North America
Solar Sun

CHALLENGE
Batson-Cook Construction is one of the premier construction organizations in the southeastern United States with expertise in general contracting, construction and design-build contracting. With long days on-site in the southern heat, Batson-Cook’s consumer-grade devices could not withstand daily field conditions—quickly running out of battery power, breaking when dropped, and overheating in the sun. The unreliability of consumer-grade devices caused downtime and high-replacement costs hindered operational efficiency. The use of these devices also posed a challenge during the layout process of construction. The laptops the team was using could not be used in the field, making it difficult for workers to show and visualize measurement discrepancies between the markups on their laptops and on-site.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Field Technologies Online? Subscribe today.

Subscribe to Field Technologies Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Field Technologies Online

Panasonic Corporation of North America